Partnership for the goalsStrengthen the means of implementation and revitalize the global partnership for sustainable development
Access to Files

Investigation of Battery Energy Storage Utilization Strategies for Reducing the Unscheduled Power Flows in the Interconnection Lines Caused by Multiple Electric Arc Furnace Operations

Özgül SALOR-DURNA

In this paper, utilization strategies for battery energy storage systems (BESS) are assessed in order to reduce the unscheduled power flows in the interconnection lines caused by multiple electric arc furnace operations in Turkey. Turkish electricity network is synchronously connected to the European Network of Transmission System Operators for Electricity (ENTSO-E) via 3 EHV transmission lines. Extensive amount of intermittent loads like electric arc furnaces (EAF) in the electricity network cause unscheduled power deviations at the intertie lines hence Area Control Error (ACE) performance de ...More

Our obligations and policy regarding cookies are subject to the TR Law on the Protection of Personal Data No. 6698.
OK

creativecommons
Bu site altında yer alan tüm kaynaklar Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.
Platforms